News and information from all corners of the ENERCON world


As part of ENERCON’s identity as a provider of solutions for the connected energy ecosystem, it is essential to remove obstacles that stand in the way of successfully implementing customer projects. In some regions, for example, there are complex height and distance limitations that prevent the use of standard towers from the product portfolio. Thanks to ENERCON’s flexible tower development, customers in such cases – assuming a positive economic assessment – can rely on competitive alternatives, as demonstrated by the example of the new 120meter hybrid steel tower for the flagship E175 EP5 E2 model.

ENERCON installed 140 wind turbines in the Atacama Desert on behalf of energy utility Colbun // Completion of a project under challenging conditions

Major order includes 13 x E-160 EP5 / First community wind farm in Saxony-Anhalt (Germany)

Neue Hybrid-Stahlturmvarianten decken erwartetes Volumen ab und machen hohe Nabenhöhen weltweit verfügbar

4.3.26
to
6.3.26
Rimini, Italy

21.4.26
to
23.4.26
Madrid, Spain

ENERCON – manufacturer and pioneer of wind energy technology
View details

Trust through stability
View details

Developed to obtain an optimum energy yield from wind
View details

Milestones in the company’s history
View details