News and information from all corners of the ENERCON world


As part of ENERCON’s identity as a provider of solutions for the connected energy ecosystem, it is essential to remove obstacles that stand in the way of successfully implementing customer projects. In some regions, for example, there are complex height and distance limitations that prevent the use of standard towers from the product portfolio. Thanks to ENERCON’s flexible tower development, customers in such cases – assuming a positive economic assessment – can rely on competitive alternatives, as demonstrated by the example of the new 120meter hybrid steel tower for the flagship E175 EP5 E2 model.

ENERCON achieved the technological breakthrough in the 1990s with the legendary E-40/500 kW. The gearless drive concept introduced for the first time with this wind turbine type still characterises ENERCON wind energy converters to this day. It also forms the basis for the new top-of-the-range model E-175 EP5 that ENERCON is currently rolling out in series production.

Following the successful fulfilment of the 750 MW turbine delivery agreements in the first phase, the companies have taken another step towards completing the 1,000 MW project by signing a delivery agreement for the remaining 250 MW capacity.

As of 2026, top model will be available with 7.0 MW and tower of 175 metres

4.3.26
to
6.3.26
Rimini, Italy

21.4.26
to
23.4.26
Madrid, Spain

ENERCON – manufacturer and pioneer of wind energy technology
View details

Trust through stability
View details

Developed to obtain an optimum energy yield from wind
View details

Milestones in the company’s history
View details