ENERCON news

E-Ship 1 back in Emden

09.07. 2010

After having completed the work at the Lloyd shipyard in Bremerhaven on schedule and its third successful sea trail. The E-Ship 1 is now back in Emden where it is to be trimmed for its maiden voyage with wind turbine components. The testing period or shakedown cruise is designed to test the performance of the ship’s systems. Once the entire shakedown of the E-Ship 1 has been completed, ENERCON will be communicating the final results and analyses.